I don’t know why I insist on thinking I am going to get anything done during the week. *sighs and pokes workbench*
Since roughly blocking out bench time wasn’t working, I figured setting up a more detailed schedule is a better bet. I’ll be adding these to the Google Calendar in just a bit (linked below)– but I figured not everyone was keeping an eye on that. 🙂
Saturday
This is the day for just getting the last touches done: photos, photo editing, sales copy, packaging, printing shipping labels, etc. With NaNoWriMo around the corner it looks like Saturday evenings are going to become my go-to day for getting the non-customizing side of the business done.
Da Horse | Da Plan |
---|---|
Black Chestnut | 5:00-5:30 — Photos, Pack, Mail |
MH Copyright | 5:30-6:00 — Photos, Pack, Mail |
Orange Andalusian (G3) | 6:00-6:30 — Photos, Post |
Purple-bay Doodle (G4) | 6:30-7:00 — Photos, Post |
Sunday
Painting day! These two need work before they’re done, plus I’ll be working on one horse while the RPG game is running.
Da Horse | Da Plan | |
---|---|---|
Black Tobi Foal (G2) | 10:00-11:00 — Paint, Photos, Post | |
Blue Doodle Foal (G2) | 11:00-12:00 — Paint, Photos, Post | |
Blue Doodle Shire (G3) | 3:00-7:00 — Doodle |
Leave a Reply